Kitchens in Bedford Hills
Bedford Hills is a hamlet in the Town of Bedford, north of Mount Kisco along the Harlem Line.
Homes range from older houses near the station to larger properties on wooded, rolling land farther out. On rural lots, ask whether the home uses propane, and plan the range and gas line work accordingly.

When you send a request from Bedford Hills, we pass it to a local kitchen contractor who works in your area. They contact you, look at the room and give you a written price, and you decide whether to go ahead. Include the size of the kitchen, what you want to change and any photos you have.
A partial update with new counters, lighting and refaced or painted cabinets costs far less than a full remodel. A full remodel that moves the sink, adds an island or opens a wall to the family room takes more planning, more trades and more time. Block Renovation estimates about 6 to 12 weeks of construction for most Westchester kitchens, and three to six months overall with design and permits. See kitchen islands and layout redesign if you are thinking about a bigger change.
Before you hire anyone in Bedford Hills, get the scope and price in writing, ask who pulls the permit, and check that the contractor holds a Westchester County home improvement license and carries insurance.
Nearby areas we also cover: Mount Kisco, Katonah, Bedford.
Kitchen projects in Bedford Hills
- Kitchen remodeling in Bedford Hills
- Kitchen cabinets in Bedford Hills
- Countertop installation in Bedford Hills
- Kitchen islands in Bedford Hills
- Kitchen layout redesign in Bedford Hills
- Kitchen flooring in Bedford Hills
- Kitchen lighting in Bedford Hills
Questions homeowners ask
How much does a kitchen remodel cost in Bedford Hills?
Most full kitchen remodels in Westchester start around $25,000, according to Block Renovation, and can pass $75,000. Sweeten estimates about $70,000 for a 200 square foot kitchen with standard finishes. Your size, layout changes and finishes set the final price.
Who will do the work in Bedford Hills?
A local kitchen contractor who works in Bedford Hills. We pass your request along, and the contractor contacts you, visits and gives you their own price.
Do I need a permit for a kitchen remodel in Bedford Hills?
Usually, if the work moves plumbing, gas or electrical lines or changes walls. Your contractor should check with the local building department and pull the permit.
How long does a kitchen remodel take?
Block Renovation puts construction at about 6 to 12 weeks for most Westchester kitchens. With design, ordering and permits, plan on three to six months overall.